
As a Sub-Contractor, we are providing the engineering services for a pipeline that connect “Haya
Depots” with the main pipelines (12” & 8”) carrying the products from Portsudan. The connection to
the depot will be with sub-lines and to be connected to Pressure Control Valves skid (PVC) to
reduce the pressure to provide suitable and save filling to the depot.
